top of page

FSE Improves Business Performance

Reduced FRP failures reduce business losses

FRP failures cost end-users $millions per year in unplanned outages

Adding FSE expertise to your project team improves FRP reliability, reduces unplanned outages, and avoids production revenue losses

Better performing FRP equipment and piping.

 

Better performing production.

​

Better performing business.

​

Adding FRP Specialist expertise and experience to your project ensures a reliable operational future for your FRP equipment or piping.

​

FSE specifications

FSE design or design submittal review

FSE third-party QA fabrication inspection

FSE third-party QA installation inspection

Preventive maintenance inspection and evaluation

shutterstock_522874111_edited.png
shutterstock_522874111_edited.png
shutterstock_522874111_edited.png
shutterstock_522874111_edited.png
shutterstock_522874111_edited.png
Videos 026.jpg

Actual examples of expensive production losses caused by failed FRP

New petrochemical complex:

  • Underground cooling water catastrophic piping failure

  • 20-day repair outage and full production shutdown

  • $1.5M USD per day / $30M USD total production revenue loss

Pulp and paper mill:

  • 24" dia. stock pipe line catastrophic failure

  • 4-day repair outage and full production shutdown of D2 pulp unit

  • $3.85M USD total production revenue loss (not including repair costs)

Ethylene glycol plant:

  • Underground cooling water piping multiple catastrophic failures

  • 4.5-day repair outage and full production shutdown

  • 9450 tons lost production

  • $1.9M USD per day / $8.4M USD total production revenue loss